SINCE
2018

New Railway with DG Track, Total Length=26.52 km with UIC 60 kg Rails, Ballast, Sleeper, Station & Buildings, Box Culvert, Level Crossing Gate, Site Office, bank Protection etc.

SINCE
2015

80 Nos. Minor Bridges with piling (1200 mm dia) work, Railway embankment works, Box Culverts, Underpass works etc.

SINCE
2014

Railway Bridge Repair and Reconstruction including Detail survey,Sub-Soil investigation, detail design and drawing for main bridge as well as diversion for bridge.

SINCE
2013

Railway Major Bridge Construction including supply and installation of girder, temporary arrangement and other ancillary works. Maximum span length 47.0 m by Through Type Truss Girder. Maximum bridge length 137.0 m by 15X2=15 m Semi Through Type Plate Girder+ 30X2=60 m Through Type Truss Girder+ 47X1=47 m Through Type Truss Girder in Bangladesh Railway.

SINCE
2005

Dredging works by dredger for Bank Protection works, Development of Lowland Catchment Area, Embankment works etc. under Government & Non-Government organization & Railway Station Building Construction as well as construction of residential & commercial Building including supply and installation all accessories.

SINCE
2002

Highway Construction with Rigid and Flexible Pavement.