Major Completed Project executed by Standard Engineers Ltd.

 

  1. Construction of 5 Nos. major bridges (Bridge No.14/M, 17/M, 22/M, 35/DR & 41/M) including supply and installation of girder temporary arrangement and other ancillary work under Bangladesh Railway in Dinajpur District at Rajshahi Zone, Contract Amount: BDT 1053.97 Million. It has been completed in the Year 2017.
  2. Balance works of Repair/Reconstruction/Construction of Bridge works in Sholasahar-Dohazari Section including supply of all required materials & equipment, labor & transportation. Package No. WD-5(A)” under Bangladesh Railway in Chittagong District at Chittagong Zone , Contract Amount: BDT 455.83 Million. It has been completed in the Year 2018.
  3. Bridge works including supply of all materials, equipment/machineries, labour & transportation cost on turnkey basis under Bangladesh Railway in Faridpur District at Rajshahi Zone, Contract Amount: BDT 457.82 Million. It has been Completed in the Year 2015.
  4. “Rehabilitation of railway Minor bridges works other than p-way etc. including supply of all materials, equipments/ machineries, labour & transportation cost on Turnkey basis" ” under Bangladesh Railway in Chittagong District at Chittagong Zone, Contract Amount: BDT 102.50 Million. It has been completed in the Year 2015.
  5. Emergency Rehabilitation Providing DBSW of Jatrabari-Kachpur Road(N1) under Narayangonj Road Division during the year 2010-2011 vide for Tender No:-DKZ-11/2010- 2011, Dated: 24-01-2012. Contract Package No: DW-P-1/11/2010- 2011 under Roads & Highways Department (RHD) in Narayangonj Road Division, Contract Amount: BDT 129.53 Million. It has been Completed in the Year 2012.
  6.  “Construction of 3 Nos. Station building; pump, reservoir and generator room; office and residential building, 6 Nos. Semi pucca barrack; godown, station approach road, internal road, boundary wall, platform shed, water tank, hydrant, pump and drain etc. at Baroipotal, Hemnagar and Bhuiyapur station including construction of platform no. 2 of Ibrahimabad station yard” under Bangladesh Railway in Tangail District at Rajshahi Zone, Contract Amount: BDT 62.87 Million. It has been completed in the Year 2011.
  7. Construction of Civil Work under Emergency Flood Damage Rehabilitation Project (EFDRP) for Mawna-Fulbaria-Dhamrai-Nabinagor Road, under Roads & Highways Department (RHD) in Road Division, Gazipur. Contract Amount: BDT 54.58 Million. It has been completed in the Year 2007.
  8. Construction of flexible pavement with widening of existing pavement at 18th, 19th, 20th, 26th & 27th K.M. of Dhunot-Bagbari-Gabtoli-Chowkirghat- Mokamtola Road under Road Division, Bogra during the year 2004-2005  under Roads & Highways Department (RHD) in Bogra Road Division, Contract Amount: BDT 39.44 Million. It has been completed in the Year 2007.
  9. Construction of Civil Work under Emergency Flood Damage Rehabilitation Project(EFDRP) for Netrokona-Thakurakona- Mohangonj-Dharmapasha Road (0.0.km to 31.50 km) & Jamalpur-Sherpur-Bongaon Road (0.0 km to 30.00 km rehabilitation of causeway only) under Roads & Highways Department (RHD) in Netrokona Road Division, Contract Amount: BDT 42.85 Million. It has been completed in the Year 2007.
  10. Construction of Patuakhali- Barguna Major Road Project  under Roads & Highways Department (RHD) in Patuakhali Road Division, Contract Amount: BDT 379.55 Million. It has been completed in the Year 2006.

In Shortly:

Bridge No. 14/M: Deck Type Plate Steel Girder= 20 m Span.
Bridge No. 17/M: Semi Through Type Plate Steel Girder = 15X2=30 m Span.
                             Through Type Truss Steel Girder = 30X2=60 m Span.
                             Through Type Truss Steel Girder = 47X1=47 m Span.
................................................................ 
Total Bridge Span Length for Bridge No. 17/M=137 m
Bridge No. 22/M: Deck Type Plate Steel Girder = 20X6=120 m Span
Bridge No. 35/DR: Deck Type Plate Steel Girder = 20X4=80 m Span.
Bridge No. 41/M: Deck Type Plate Steel Girder = 15X2=30 m Span.
                             Semi Through Type Plate Steel Girder = 20X1=20 m Span.
................................................................ 
Total Bridge Span Length Bridge No. 41/M=50 m